So began the install of the new UV filter on the 210g. Decided it would be a good time to switch my ball valve on the Herbie to a gate valve and re-seat all the bulk heads on the overflow system, plus change out my return pump to the newer larger model I got a year or so ago. What an exhausting day. I am still not done. I am currently waiting for the pvc to settle a bit cuz the glue is nasty.
Then I have to fill the tank..... Oh, my goodness cross fingers nothing leaks. I am not sure my hubby will be supportive if we have a major leak. :rolleyes:
What happened doing all this, well first thing is I did not empty enough water in the tank before removing the internal box and made a nice waterfall into the junction box. Luckily, I covered it with plastic, so it did trip the circuit and such, but I am hoping it still works. ;)
Next I spent half the day trying to get the right size pipe done. Cut and cut and cut. Glue and glue and glue. But, should be better if it all does not leak.