How are they packing those tanks for shipping? I had to pay $150 for a crate for my 125, but it got here in perfect condition. Loads of styrofoam also. Nothing like 125 gallons of peanuts!
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
“Look, Fra-gee-lay. Must be Italian”
How are they packing those tanks for shipping? I had to pay $150 for a crate for my 125, but it got here in perfect condition. Loads of styrofoam also. Nothing like 125 gallons of peanuts!
I is working and I appreciate it brain dumpThat's fair, you sparked a brain dump with something in your build thread and I kind of threw up all over the place last week
ok so I delayed on answering your question @Robin Haselden because I was having some back and forth conversations with IM.
I finally got to the point when it was late Tuesday and I still didn't have tracking info where I said to Paul, "Look I was told last week for sure. Last week came and I was told Monday or Tuesday for sure. Here it is late Tuesday and my tank still isn't shipped yet. I know it's not on you but whoever is in charge of Logistics need to get there beeeeep together and get my tank out."
I got a response back from Paul where he said he literally walked into shipping and yelled at everybody to stop everything they were doing and get my tank out ASAP. A few hours later I had tracking info. So IM logistics, not so impressed. IM Paul having my back and making sure I get taken care of, remain impressed.
In regards to the fire pit I STRONGLY suggest against one of the pre-made kits. The pre-made kits come with a metal insert and a price tag of $100+ more. I built the outer ring, got the river rock and the pit itself for less than I would have paid for the pre-made kit by just buying the pieces individually.
Got the last pieces in for the buggy today. Got everything done except for the flood hooked up. I'll take pictures tomorrow when it's finished.
Hooray, tank #3 on the way. This is the one im sure.
I was going to go completely hand made. I want to lay a stone path from the porch steps to the gate, then off the side of that build a patio area with an actual pit in the middle. I just need the motivation to go buy the stone, motar and a truck load of sand.