Started to unpack some equipment and got it into place:
Bubble King 200
Sicce Syncra SDC 9.0 WiFi return pump
Tunze Osmolator ATO
BRS heaters 1x300 and 1x600 Watt
APEX controller
Drilled holes in the electrical cabinet for all the wires and power cords. Still need to get some grommets for the holes. This is not part of the Waterbox cabinet/stand but a seperate unit
Started slowly to install some controllers. In the end almost no wires/cables should be visible.
Bubble King 200
Sicce Syncra SDC 9.0 WiFi return pump
Tunze Osmolator ATO
BRS heaters 1x300 and 1x600 Watt
APEX controller
Drilled holes in the electrical cabinet for all the wires and power cords. Still need to get some grommets for the holes. This is not part of the Waterbox cabinet/stand but a seperate unit
Started slowly to install some controllers. In the end almost no wires/cables should be visible.