APEX Programming help

seawater25

New Member
View Badges
Joined
Oct 8, 2025
Messages
3
Reaction score
0
Location
Galveston
What state or country do you live in
Texas
Rating - 0%
0   0   0
I am trying to configure my APEX to run my morning spawning pump on/off protocol automatically after a feed cycle. I have Feed A set up, but can't figure out the coding for Feed B to do the following:

Not interfere with feed A
Execute 7 minute feeding cycle with FeedB that turns off Return and Wave pumps, then all turn back on after cycle ends
At 9:00am, automatically turn off Return and Wave pumps, then back ON at 11:30 - but ONLY when FeedB is activated

I don't use FeedB every day, so I need the pumps to behave normally if FeedB is not activated
 
You cant directly trigger another feed cycle via command are you saying you want coding for for feed cycle b when you manually activate it? If so not following where 9 am comes into play if you are manually activating when needed
 
Upvote 0
I would trigger the feeding cycle manually, I need the coding that would allow the feed cycle executed followed by an automatic shutoff at 9am to accommodate spawning. I know you can program time sequences to happen automatically, I just don't know if I can program it to only happen on days I manually trigger that feed cycle instead of every day.
 
Upvote 0

WHAT KIND OF SUBSTRATE ARE YOU RUNNING ON YOUR TANK?

  • Bare bottom

    Votes: 5 23.8%
  • A shallow bed of fine sand

    Votes: 4 19.0%
  • A shallow bed of coarser sand

    Votes: 4 19.0%
  • A deep sand bed

    Votes: 3 14.3%
  • Mixed substrate or varying sand depth

    Votes: 5 23.8%
  • Some other substrate (posted in the comments)

    Votes: 0 0.0%
  • I don’t have a reef tank yet

    Votes: 0 0.0%
Back
Top
Home
Post thread…
Market
What's new