Swinging by the house tomorrow to see if they've made any progress on the red tags. "Final walkthrough" is supposed to be the 19th.
They can't call for the other 2 inspections until these 2 are fixed and cleared. Not sure if it's the same across the board, but here they have 7 working days to fix everything tagged or they get fined. If they fix it sooner, great. They'll get reinspected the 20th at this point if they don't call and get it in sooner. Not sure how we can do a final walkthrough on the 19th if all the inspections haven't been called for or cleared....
They also have a week to fix the front and garage door paints.
Plus all of this we found on a quick breeze through:
| where | what |
| General | All doors nail holes not filled |
| General | Every base board has grout cracked |
| |
| First spare bedroom | Closet track is bent |
| Hallway | Scratch on closet door |
| Left office | Door trim damaged and poorly patched |
| Right office | Ceiling fan wobbles |
| Master bedroom | Ceiling box needs touch up paint |
| Master Bedroom closet | Waterlines painted over |
| Master Bedroom Closet | Need to cap dryer vent |
| Master Bedroom Closet | Water hook ups missing plastic frame |
| Master Shower | Hole in wall door frame |
| Master Shower | Grout line gaps around window - looks unfinished in general |
| Master Shower | Grout lines cracked in corners |
| Spare bathroom | Duct fan painted over, impeding function |
| Spare bathroom | Rust in tub from dropped tool |
| Spare bathroom | Toilet needs caulk |
| Master toilet | Duct fan painted over, impeding function |
| Master toilet | Toilet needs caulk |
| Living room | Patch work does not match wall texture. |
| Kitchen Window | tile around window framing ridiculous |
| Kitchen Backsplash | uneven top tile line left of window |