Hello all.

Here is the situation. I have a new house, built in 2015. It's an average house, not a mobile home or a super expensive thing either.

I want to place a Waterbox 230.6 or similar size at one of the following locations. See the attached images. The placements are across several joists, the details of which are in the images.

Yes, I do intend to eventually get a structural engineer to sign off on it, but is doing something like this normal, or should I stick to something smaller like a 90 or a couple of 45s?

01 - Upstairs floor layout.jpg

02 - Downstairs and Joists.jpg
 

jsker

Reefing is all about the adventure
View Badges
Joined
Apr 11, 2015
Messages
25,093
Reaction score
77,773
Location
Saint Louis
Rating - 0%
0   0   0
Yes, I do intend to eventually get a structural engineer to sign off on it, but is doing something like this normal, or should I stick to something smaller like a 90 or a couple of 45s?

is this a current picture? If so, have the builder reinforce the floor joist with the sign off of the engineer for insurance reasons would be the most economic, and structurally way to go
 

That Crusso Kid

10K Club member
View Badges
Joined
Oct 21, 2018
Messages
14,882
Reaction score
75,965
Location
SW, FL, USA
Rating - 0%
0   0   0
Welcome to R2R, Jack.

I see no problem with doing to 230.6 as long as the joists are reinforced and supported properly.

tenor.gif
 
OP
OP
J

Jack Hayden

New Member
View Badges
Joined
Apr 6, 2019
Messages
3
Reaction score
19
Rating - 0%
0   0   0
is this a current picture? If so, have the builder reinforce the floor joist with the sign off of the engineer for insurance reasons would be the most economic, and structurally way to go

If you mean the photo itself, no. That was when it was being built. It's all finished now. I'm not sure that tearing out the walls and adding anything is something I will be allowed to do. So let's assume I'll have to stick with what we have here.
 

jsker

Reefing is all about the adventure
View Badges
Joined
Apr 11, 2015
Messages
25,093
Reaction score
77,773
Location
Saint Louis
Rating - 0%
0   0   0
If you mean the photo itself, no. That was when it was being built. It's all finished now. I'm not sure that tearing out the walls and adding anything is something I will be allowed to do. So let's assume I'll have to stick with what we have here.

I would suggest, showing the above picture to a engineer. The engineer would answer all your question in a matter of minutes and the Ms. will give you the green light;)

Your are looking at the Peninsula 7226?
 
OP
OP
J

Jack Hayden

New Member
View Badges
Joined
Apr 6, 2019
Messages
3
Reaction score
19
Rating - 0%
0   0   0
I would suggest, showing the above picture to a engineer. The engineer would answer all your question in a matter of minutes and the Ms. will give you the green light;)

Your are looking at the Peninsula 7226?

Originally actually, yes. I was going to put it out in the middle of the floor, but then there'd be little room between it and the door area, so there would never really be anyone on that side of the tank, so against the wall is better.
 

jsker

Reefing is all about the adventure
View Badges
Joined
Apr 11, 2015
Messages
25,093
Reaction score
77,773
Location
Saint Louis
Rating - 0%
0   0   0

Big G

captain dunsel
View Badges
Joined
Jun 8, 2017
Messages
12,921
Reaction score
24,228
Location
Southern Oregon
Rating - 0%
0   0   0
Welcome to R2R, Jack! I have a 90 setup in a very similar looking situation to your "Final Backup Plan". It's crossing the floor joists and right next to a load bearing beam. Works great. As always, your mileage can vary. Having a structural engineer take a look at your pics would be a great idea, especially if you live in earthquake country.
 

TOP 10 Trending Threads

WHAT AMOUNT OF LIVE ROCK AND SAND SHOULD BE PRIORITIZED FOR OPTIMAL BIODIVERSITY/FILTRATION?

  • 100% live rock + bagged sand

    Votes: 35 28.7%
  • 100% dry rock + 100% live sand

    Votes: 41 33.6%
  • 50/50 live/dry rock, 50/50 live/bagged sand

    Votes: 27 22.1%
  • 75% live rock, 25% live sand

    Votes: 11 9.0%
  • 25% live rock, 75% live sand

    Votes: 8 6.6%