- Joined
- Jan 1, 2020
- Messages
- 237
- Reaction score
- 459
Hey all,
So... it’s tough for me to wrap my head around how to complete hard PVC connections when connecting two fixed points. Only attempted once before and having trouble finding good instructions. Any pointers or tutorials/videos anyone found helpful?
Right now I am plumbing my innovative marine INT 75 to an icecap 30 reef sump. So i am going from 1”bulkheads to 1” fixed connections at sump. I’ll attach a picture of where I’m at now and trying to think about the best approach to finish up the main drain without too much guesswork.
I’ve glued everything but the piece attached to the sump and gate valve.( just dry fit there to show what I’ll attempting) The plan from here is remove the last elbow at that union and glue from sump to gate valve to the elbow I remove. Then hope I’m close enough on measurements/angle to reconnect the Union lol, any better ideas?
So... it’s tough for me to wrap my head around how to complete hard PVC connections when connecting two fixed points. Only attempted once before and having trouble finding good instructions. Any pointers or tutorials/videos anyone found helpful?
Right now I am plumbing my innovative marine INT 75 to an icecap 30 reef sump. So i am going from 1”bulkheads to 1” fixed connections at sump. I’ll attach a picture of where I’m at now and trying to think about the best approach to finish up the main drain without too much guesswork.
I’ve glued everything but the piece attached to the sump and gate valve.( just dry fit there to show what I’ll attempting) The plan from here is remove the last elbow at that union and glue from sump to gate valve to the elbow I remove. Then hope I’m close enough on measurements/angle to reconnect the Union lol, any better ideas?