Abyzz Pump with Apex Control

psumms

Active Member
View Badges
Joined
Sep 11, 2019
Messages
189
Reaction score
124
Location
United Kingdom
What state or country do you live in
United Kingdom
Rating - 0%
0   0   0
Hi all, i've just added an Abyzz Apex 0-10v port controller - Working great, however... Testing what happens if the connect between pump and Apex is lost... the pump shuts down! Is there a way to add a 'Fallback' to a 0-10v controlled device? Alternatively, possible to set a fallback on the Abyzz controller? I can't see anything can be controlled on the Abyzz box once it detects the external interface controller. Have Googled but can't find anything regarding this.
 
Not aware of anything build in and same happens with Tunze when set to be controlled via 0-10V.

I'm working on a solution for both my Tunzees and the Abyzz on the new build with a relay to provide alternate source of voltage so that in the event of failure it could switch to say 1.5V provided by AA and work at 15% or something like 18650 and work at ~40%.

That said, nothing to report yet as I dont have a complete prototype and have been swamped.
 

TOP 10 Trending Threads

HOW MUCH DOES A FISH’S FEEDING REQUIREMENTS AFFECT YOUR STOCKING DECISIONS?

  • A lot! - I avoid fish that require frequent or specialized feeding

    Votes: 21 31.3%
  • Quite a bit, but an automatic feeder can change my answer

    Votes: 10 14.9%
  • It depends on whether my nutrient export can handle it

    Votes: 9 13.4%
  • It depends on how badly I want the fish

    Votes: 14 20.9%
  • Not much. I’m willing to adjust my routine

    Votes: 12 17.9%
  • Not at all. Feeding demands don’t limit my stocking choices

    Votes: 12 17.9%
  • I usually learn about the demanding feeding schedule after buying the fish!

    Votes: 2 3.0%
  • I haven’t really considered this before

    Votes: 4 6.0%
  • Something else (see my comments in the thread)

    Votes: 2 3.0%
Back
Top
Home
Post thread…
Market
What's new