Knowing myself, I couldn't stand still. I ran the supply line and return line for the AWC. I didn't fasten the waste line all the way, just zip tied it to a line that was there for roughly 15ft. I will fasten the line all the way over the weekend as it will mean I have to add supports for the line to fasten to.
HA HA, again, I couldn't stand still and fastened the line. I just have about 15ft left to fasten.
I ended up fastening roughly 50-60ft of waste line.
HA HA, again, I couldn't stand still and fastened the line. I just have about 15ft left to fasten.
I ended up fastening roughly 50-60ft of waste line.
Last edited: