Hopefully I will make some more progress this upcoming weekend. I do have the cabinet doors on and the baseboard cut to fit need to prime then install then trim around the tank. After that I'll need to put up the crown molding and paint the bottom of the room and touch up and I should be all done. That is if I can drag myself up off of my butt for long enough lol... wiped out after the swap to the new frag tank and getting the 125 tied in.
Here is a link to the new frag tank thread, hopefully some new pics tonight provided I get them all ready to put up:
Thank you! Sorry but not at this point. Nothing is all that impressive and I need to get someone over that has an SLR to try and get shots, I am not patient enough to try with a point and shoot.