Well holy smokes......that was quite a project. Huge thanks to the group that helped out, I could not have done it without them. We were able to get the live stock out into the bins, drain the tanks, move them by lifting a bit, then getting them on moving blankets and sliding them. The display tank was able to stay on the stand and the sump stayed in the stand.
It was a very long day but I think most of us enjoyed it. There were no emergencies or "ut oh" monents.
Tomorrow I will tear out the remaining carpet and prep the floors and the tile guy will come Monday and by Wednesday the tile should be done!
Now here is hoping we didn't upset the bio logical balance of the system too much. I am planning on doing a lot of water changes over the next week to help with the disruption.