request confirmation on RODI unit plumbing

  • Thread starter Thread starter TimSt
  • Start date Start date
  • Tagged users Tagged users None

TimSt

Community Member
View Badges
Joined
Jan 15, 2022
Messages
92
Reaction score
99
Location
Rhode Island
Rating - 0%
0   0   0
My BRS RODI unit arrived damaged (a couple of broken fittings). BRS was great and immediately sent replacement parts. I made the repairs this morning, but like a dummy, I didn't take a picture of the tubing arrangement before taking things apart and putting it back together.

Posted is a photo from the back of the 3-stage BRS 75 GPD unit. Could someone with this unit (or similar) tell me if the left side black and blue tubes are going into the right ports on the RO unit? I'm referring to the left side of the picture. I think I put things back correctly, but just double-checking before I move forward with making water. Thanks in advance!

RODI.jpg
 
It looks like it is hooked up correctelly the flush valve should be on the waste port and it is.There are hook up diagrams and pictures on the BRS website

1651332147195.png
 

TOP 10 Trending Threads

IF YOU WERE CHOOSING YOUR MAIN REEF TANK TODAY, WHAT SIZE WOULD YOU PICK COMPARED WITH YOUR CURRENT

  • Much smaller

    Votes: 1 2.3%
  • A little smaller

    Votes: 0 0.0%
  • About the same

    Votes: 1 2.3%
  • A little larger

    Votes: 16 36.4%
  • Much larger

    Votes: 17 38.6%
  • About the same volume, but different dimensions

    Votes: 4 9.1%
  • I’d keep this one and add a second tank

    Votes: 2 4.5%
  • I don’t have a reef tank yet

    Votes: 0 0.0%
  • Other (Post in the comments)

    Votes: 3 6.8%
Back
Top
Home
Post thread…
Market
What's new