    Similar failure of a Neptune Powerbar EB6 with two outlets failed on (one being heat and the other ATO!) and all others off, regardless of "FALLBACK" programming. Fortunately the heater thermostat prevented a tank overheat and the ATO back up high level sump float switch prevented a flood. Both FMMs also failed. Currently running Apex 2016 off independent 12V PS without PowerBar attached for monitoring pH, Temp, Salinity, and have restored WAV power heads and DOS for 2 part dosing. Don't get me started on the unreliability of Neptune FMMs and the attached flowmeters, optical sensors and leak detectors...I programmed many control loops based on these sensors and have learned my lesson.

    Eager to follow your progression and attempt replicating with GHL on my next build. For now will strip down Apex to passive monitoring and no outlet control due to its toygrade reliability.
     
    airmotive and Dumaurier7 like this.

  2. n2585722

    n2585722 Well-Known Member R2R Supporter Build Thread Contributor Partner Member 2018

    Joined:
    Jun 17, 2013
    Messages:
    862
    Likes Received:
    210
    Location:
    Cedar Park, Tx
    pa30crewchief, I would have to assume that for fallback to work that progamming would have to be in the power bar itself. On the controller I have after you setup the default you can test this by unplugging the powerbar from the buss. After a few seconds it should default to those settings. There is a chance for them not to react like that if the controller is still sending out a buss siginal even though it is not working correctly. So it is possible that the issue is the controller and not the power bar.
     
  3. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Good Morning, (Still waiting on a few parts so I can swap everything out)

    First Flow Sensor Replaced: (In-Line to the Reefgium)

    Picture of the Old Apex FMM:

    IMG_1113.JPG

    GHL Now inline:
    IMG_1114.JPG

    Configuration of Flow Sensor:

    From within GHL Control Center Application
    Expand Probe/Sensor controls
    Click on Flow Sensors
    Choose the Flow-Sensor Number you wish to use
    Click on the Determine the Calibration button, and choose the type of flow sensor (Mine was 9000 l/h)
    Connected at Level sensor (Choose the port number that the sensor is connected to) for my setup it was #4

    Since this is l/h to convert to g/h you need to divide the number by 3.785 liters or below approx 380 Gallons an hour.

    Flow_sensor_P4.jpg

    Interesting how the FMM use to say it was 257 Gallons an hour:
    Flow_Sensors.jpg
     
  4. Nstocks

    Nstocks Member

    Joined:
    May 29, 2017
    Messages:
    6
    Likes Received:
    0
    Rumor has it GHL released new features to myGHL.com? Is this true?

    Highly appreciate you posting the comparisons between the two controllers :)
     
  5. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    It does look like they release some new options in myghl. I am, trying to find release notes, but in poking around found:

    Log Book Option is now on the side menu:
    logbook.jpg

    We can now add our own events now to the calendar under our own categories
    catagories.jpg

    Still playing with this, it seems you can add a single instance note, I am seeing if there a way to have a re-occurring not.

    Apex fusion has a calendar event also, they can do re-occurring notices
    apex_fusion_Calander.jpg
     
    Last edited: Aug 12, 2017
  6. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Looks like they are also adding charts to the probes within myghl and comparing them to other probes whooohoo;Woot
    charts_myghl.jpg
     
    Last edited: Aug 12, 2017
    MrMichael likes this.
  7. chefjpaul

    chefjpaul Well-Known Member R2R Supporter Build Thread Contributor Partner Member 2018

    Joined:
    May 21, 2014
    Messages:
    1,993
    Likes Received:
    1,978
    Location:
    NYC
    Nice, I probably should download the newest version, as I think I'm still on
    9.6
     
  8. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    ProFilux Touch:

    Very Simple to install. Connect the PAB Cable to the ProFilux Touch Control unit, plug in the Control unit that drives the display and plug in the display into the control unit and your in business.

    ProFilux Touch Configuration: (Display what you wish to see on the screen)
    From GHL Control Center
    Click on Display
    Click the check boxes next to the options you wish to display on your display.
    Save changes and your done

    display_1.jpg

    ProFilux Touch Online: (This one is in the basement next to the Sump)
    P4_Display.JPG

    PS: Calcium Reactor Probe is not online yet (It not been calibrated just connected)

    Apex Display in comparison:
    Apex_Display.JPG

    ATO Sensors:

    I also placed the ATO replacement sensors online. I pretty much followed the GHL Video on a two sensor install


    ATO_Online.JPG

    This was Two sensor installation. and following the Video made it quite simple.

    ATO_COmpleted.jpg
     
    MrMichael and chefjpaul like this.
  9. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    I am still waiting on the final parts that shipped out Wednesday so I can complete the installation:

    Updated Firmware to 7.08 and GCC 1.0 (beta)

    Once you have installed the update, and upgraded your Wireless Firmware, a new option appears called email notifications, you set up your email preferences, and the type of alerts/notifications you wish to receive.

    alert_types.jpg

    I have to say this is the feature I been actually waiting for, as I rely heavily on alerts, if an issue comes up within the tank. So I am very happy to see now that this is online for the P4.


    Notifications are now working:
    Date: Sat, 19 Aug 2017 16:39:08 +0200
    Subject: Test
    Test Message Temperature 1 : 75.3F
    pH-value 1 : 8.06pH
    Redox 1 : 294mV
    Conduct.(S) 1 : 51.0mS
    pH-value 2 : 5.72pH
    PH-VALUE 3 : 8.06pH
    Flow 3 : 2276l/h
    Flow 4 : 1406l/h

    Setup up text Notifications also:
    text_message.jpg

     
    Last edited: Aug 19, 2017
  10. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Also with the update myghl is now recording and graphing probes within the website:

    Graphing of Probes now in MYGHL:
    graph_ph.jpg

    orp_charted.jpg

    As Apex users already know Fusion already allow you to graph your probes over a specific period of time, now MYGHL web service does it also. What I notice you can not do that Apex Fusion can do is cross compare two probes. But a great first step.. (Fusion Graph example on Post 24)
     
    Last edited: Aug 19, 2017
    d2mini likes this.
  11. Fishnerd7

    Fishnerd7 Well-Known Member

    Joined:
    Aug 7, 2017
    Messages:
    72
    Likes Received:
    71
    Location:
    California
    Following intently. I like the detail in your thread here. Much needed for someone like myself who can compare. Thanks.
     
  12. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Sorry for not posting, work has had me working extensive hours so my conversion has slowed down and was also fabricating a light holder, but I am back at it.

    Still left to Complete:
    Migrate Chiller over
    Migrate Heaters over
    Migrate MP40's and Mp60's Over
    Migrate Oxygen Sensor Over
    Migrate Lighting and Schedule over
    Migrate Calcium Reactor Over
    Install 2 PAB on First Floor to Control Lights, heaters and Fans
    Install Second Display unit
    Install 2 Solenoids, for CO2 Scrubber for Skimmer
    Install Expansion Box

    On Order:
    KH Director with 4 pump Doser unit
    2.1 SA 4 pump Doser Unit


    At the same time, I will be switching out my T5 lighting with Orphek lighting. The V4 slimline versions, with Mitras Light Bars, to be used for sunrise and sun set. I had a few friends switch to them, and love them so I thought I would give them a try, and after talking with support and sales, and the width of my tank they recommended these. (Lets see how they work) I have taken readings of my T5 lighting, and will place the LED lights over them and adjust the height for the same results.

    Some Observations:
    Sold as a rock without any issues (Running the latest Beta software)
    Alerts have been coming in (Example when my Skimmer Bucket fills up)
    System been graphing without any issues
    Website can be slow from time to time
     
    Last edited: Oct 9, 2017
    MrMichael likes this.
  13. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    As I stated in the Previous post, I needed to fabricate a bracket to hold 6 LED lights. 3 of them are V4 Deep Blue, and 3 of them are V4 Reef. I wanted to make sure they went the entire length of the tank, and enough space in the middle to mount the two Mitras Light bars.

    So using stainless steal a light holder is created to mount the lights side by side. Each light is Approx 24 inches. 1/2" along the outer side and approx 1 1/2 spacing between the lights.

    First what it looks like in length:
    llight_2.JPG

    What one looks like up close and mounted:
    light_3.JPG

    And now Side by Side:
    light1.JPG
     
    chefjpaul likes this.
  14. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Expansion Box is now online, and located under the fish tank upstairs. This unit has the O2 Card Installed, and will have connected to it 2 PAB, 1 Ptouch controller, 1 Vortech Controller, and last a Mitras Light bar controller.

    Expansion Box: (Took me longer to run the cable)


    Very Simple to install.
    Connect the PAB Cable to the Expansion box.
    And Follow the Steps back on Step 25 (It's very very simple)

    With it now installed MyGHL Web Portal dashboard now has few more gauges. The plan is for the O2 to be installed in the sump downstairs via a 15ft BNC extension Cable from the expansion Box. Within the Expansion Box, PH controller, Salinity, ORP and temperature probe will be installed in the tank hidden within the overflow box and used for redundancy in the event an issue happens with the sump probes.
    sensors_online.jpg

    Flow Sensor 1 is my return pump and Flow sensor 4 is my reefgium.

    Flow sensors Conparsions:
    Flow Sensors can not be graphed in MYGHL and can be in the Apex Web Fusion Portal, as show in Post 63 above. You can set alerts on the Flow Sensor as shown below, like that of the Apex.

    flow_alarm1.jpg flow_alarm1_Apex.jpg
     
    Last edited: Oct 9, 2017
    Be102, MrMichael and JoshH like this.
  15. JoshH

    JoshH Well-Known Member R2R Supporter Build Thread Contributor Partner Member 2018

    Joined:
    Dec 3, 2016
    Messages:
    832
    Likes Received:
    617
    Location:
    Calgary, Alberta, Canada
    Detailed as always, keep up the awesome work! I was sold on GHL before this but all the information and step by step comparisons have made me much more confident in my decision. This should be stickied!
     
    Last edited: Oct 22, 2017
    Ditto likes this.
  16. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Lights all Mounted and Programmed:

    This was a two step process since of the lights are controlled from the outlets and 2 are Mitras Simulation Bars which which were run down the middle to replace my Apex Lunar Module, which will be used to simulate sunrise and sunset and moon at night.

    In Fusion, I use to use the Season Tables and apply them to outlets simulating my Blue would come on first, then I had 3 Metal Halide bulbs each one would turn on from East and west and turn off from East to west based on the season table, took me a while to dial it all in but was nice affect. Below is a snip-it of the code I had on one of the outlets shown in Apex Fusion.
    Fusion_light_apex.jpg

    Since I could not use the Season Table to control the P4 I had to come up with another way to do it, so below is what I did..

    First lets show the lights mounted in the holder with the 2 Mitras Simulations Bars

    IMG_1236.JPG

    As you can see from the Photo above the Mitras Bar fits perfectly between them.

    Step 1:
    Installed Two Additional power bars to be used on the Display Tank to power up devices: (Post #25 shows how to add devices through the GHL control Center)

    Powerbar 5.1 (Third Unit)

    Switch Port Always on: GHL Touch Dispaly Power Supply
    Switch Port #11 – Blue 1
    Switch Port #12 – Blue 2
    Switch Port #13 – Blue 3
    Switch Port #14 – Tank Heater #1
    Switch Port #15 – Not Used Yet

    Powerbar 5.1 (Forth Unit)

    Switch Port Always on: Mitras Driver and Expansion Box
    Switch Port #16 – Reef 1
    Switch Port #17 – Reef 2
    Switch Port #18 – Reef 3
    Switch Port #19 – Tank Heater #2
    Switch Port #20 – Not Used Yet

    Settings Timers:
    Inside GHL Control Center, click on the Process right hand menu which will expand the Timers. (Post #40 Shows how it can also be done in the MyGHL Web Application)
    timer_1.jpg

    Choose the Timer you wish to set up, for me it was Timer 2
    Click New
    And Choose the Time interval you wish below this was 5:00am to 6:00pm
    timer_2.jpg

    I repeated this processes 6 times one for each of the LED based on the timer interval I set for them with the schedule of each shown below.

    Timer Schedule:
    Timer 2 - 5:00 to 18:00 (Blue 1)
    Timer 3 - 6:00 to 19:00 (Blue 2)
    Timer 4 - 7:00 to 20:00 (Blue 3)

    Timer 5 - 10:00 to 15:00 (Reef 1)
    Timer 6 - 11:00 to 16:00 (Reef 2)
    Timer 7 - 12:00 to 17:00 (Reef 3)

    Assigning the Timers to the Outlets:
    Click on System
    Click on Switch Channel and outlets
    Click on the outlet your going to apply the Timer on and click edit
    Change the Function to be Timer you would like assigned to the outlet

    I repeated the process 6 times 1 for each outlet with the the final results below:

    timer_3.jpg



     
    Last edited: Oct 15, 2017
    Tristren likes this.
  17. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    Step #2:

    Installed Mitras-Simu Driver Module (Used to drive the Mitras Simulation Bars)

    By plugging it not into the PAB but the L1L2 and L2L4 ports of the Expansion Box

    The Mitras is a Variable 1-10V device used to drive the Mitras Simulation LED. I plugged one of the Mitras Simulation LD into Output 1 and the other into Output 2.

    The Mitras Simulation Bars are 4 Channel Each, one L# Channel for each color LED in the Mitras Simulation Bar

    Since I am for now only going to do Blue and White, green and red can be added later, I need to first set two illumination channels.

    Settings Illumination Channel:
    Inside GHL Control Center, click on the Illumination right hand menu which will expand the Illumination Channels.
    ill_1.jpg

    Choose the channel you wish to work with and a window appears with the options
    ill_2.jpg


    It is Important since this is 1-10V controlled device that the Dimmable option is set so you can set the brightness of the channel from 1 to 100%.
    Once you have select Dimmable click on new button and enter the star and stop time and brightness you want each interval of you light to be at.

    For sunrise and sunset, I am just doing a Ramp up from 0 to 100 Blue effect and in reverse at sunset, and lower in the middle of the day
    ill_3.jpg

    For Moon, I am using a ramp up to 100% affect and check the box the Depends on moon-phase which will now adjust the intensity of based on the phase of the moon seen in the simulation tab
    ill_4.jpg
    Simulation
    Clicking on the Simulation under the Illuminations shows the moon settings along with a few other nifty settings
    Moon_5.jpg

    Now that my Illuminations are all set up need to assign them to the 1-10V Ports:

    Settings 1-10V Interface:
    Inside GHL Control Center, click on the System right hand menu which will expand then select 1-10V Interface

    ill_6.jpg
    The Mitras Simulation Bars use four L Channels one for each Color (Red, Green, Blue and White) since I had an expansion module mine appeared on the L7 though L10, as you can see below I named mine, and set the blue and white to the illumination function I programmed above
    ill_7.jpg

    I programmed the remaining as Channel 32. This channel was the last one in my Illumination function list and I made sure it was set all to 0 or off.

    Now I have Blue Ramp up, with Moon Effects over the tank.
    IMG_1245.JPG

    Taking PAR Reading also to compare between the T5 and Metal-Halide and the new LED lights.
     
    Last edited: Oct 15, 2017
    Tristren likes this.
  18. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    pa30crewchief I am sorry for missing your post,

    I have not put my steps online about the doser been playing and testing it but will be soon but I Love it!!

    I posted on the flow meters I like them, I wish they could be charted out or used for programming. Example I see flow dropping because of a possible leak.

    I have used float switches now to turn off my skimmer and also switches for ATO also posted above.

    Again I apologize for the very later reply.
     
    MrMichael likes this.
  19. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    VorTech Controller

    Next on the to do list is the conversion of my 3 Vortech Powerheads (2 MP40 and 1 MP60) from my Apex WXM module to the GHL Vortech Controller.

    I have a complex programming for my pumps based on the season table based utilizing 16 profiles on the Apex. To be fair to Neptune Systems you do not need to do it this way, but I always tried to simulate everything I could using the season table.

    In Apex Fusion you have two ways to program your pumps, either through the use of a graphical interface where you can set the intensity you wish and the times, along with the effect you wish for the pump as shown in the screen shot below:
    vor4_fusion2.jpg
    or
    Through the Advanced Tab where you can program it also by using profiles, which are just specific Vortech control settings you want to use for that specific period of time as show below:
    vor3_fusion1.jpg

    So above is what I am going to re-produce, maybe not perfect since I do not have access to the the season table but will be so close my fish and coral will not know the difference and if they do I will let you all know.:)

    Adding GHL Vortech Controller

    Again was very straight forward an quite simple, connect the PAB cable and then:

    Inside GHL Control Center, click on the System and to the right you will see Assign devices on the right hand side click on it and highlight the Vor-tech-Controller and click Ok.
    System will warn you your going to be disconnected
    vor1.jpg
    Reconnect with GHL Control Center and you will now see a new Menu option Appear called VorTech Overview
    vor2.jpg
    Expanding the VorTech Overview provides a new set of options:
    Vor_3.jpg

    Now the important steps, follow the steps outlined in the https://www.aquariumcomputer.com/downloads/vortech-controller-manual/ to pair the pumps to the GHL Vortech Controller. Page 7 of the manual

    Reset your Pump:
    Reset pump Press the mode- and set-key at the pump control unit both at the same time and hold them until the LED at the pump control unit flashes in the colors red, white and blue.
    Afterwards press the mode-key at the pump control unit and hold it until the LED at the pump control unit flashes in the colors red and purple.
    After that, press the set-key at the pump control unit and hold it until the pump resets. The LED switches off for a short instant and then becomes green.

    Address the Pump:
    Address pump Press the mode- and set-key at the pump control unit both at the same time and hold it until the LED at the pump control unit flashes in the colors red, white and blue.
    Afterwards press the set-key shortly at the pump control unit. The LED at the pump control unit flashes in the colors blue and yellow.
    The pump is assigned to the next available address. If the process doesn’t work properly, you have to start again with the point „Reset pump“.

    Repeat each step above for each Vortech Pump
    Address a further pump Further pumps can be assigned. For this, simply start with point Reset pump for any further pump.

    Complete the assignment of the pumps When all pumps have been assigned, the process has to be completed. This is done in ProfiLux-Control. After activating the key end and save assignments, the LEDs of the assigned pumps don’t flash blue and yellow anymore, but they show the current operating mode. If this should not be the case for one pump, you have to begin again with the process for this pump with the point Reset pump.

    Vinny and I are going back and forth I am having an issue pairing my Controllers to the unit. Both my MP40 and MP60 are QD versions. I will post the next steps once I have them paired and what we did to resolve it. I am very impressed on how fast GHL got back to me when I asked my support question again thanks Vinny for all the help.
     
    reefwiser likes this.
  20. Ditto

    Ditto Well-Known Member R2R Supporter Partner Member 2018

    Joined:
    Apr 25, 2017
    Messages:
    142
    Likes Received:
    105
    Location:
    Albany, NY
    My multiple Orphek LED slimline have been on the tank now for 1 full week, and the Coral seem not aware of the change. PAR reading have been taken all over the tank and I had to raise the LED from 10 inches to 11 inches above the tank to match the old PAR readings on my tank. With the lid on the tank the top of my tank at the water is approx 500, the middle 300 and approx 150 on the bottom. I have a few area's that are in the 100 PAR reading, but those are in crevices, and or entrance to some tunnels between rocks.

    I am ecstatic with the results. Having the LED lights span the entire length of the tank allows for a even lighting affect across the entire tank.
    Coral_1.JPG
    Coral_2.JPG

    Now that I been able actually see the Moon simulation in action over the last few nights using the White LED's in the Mitras Simulation Bar, I can say I am very impressed. Unlike the Apex LSM which on my tank was 5 string LED's provides a nice warm white glow across the entire tank based on the moon phase.
     