- Joined
- Dec 5, 2009
- Messages
- 2,873
- Reaction score
- 343
Planning out a new tank and want to get it pre-drilled for an overflow from glass-holes.
The tank is going to be rimless. Question is, where should the water level be in the tank? I was told the water level would be about 1/2-3/4 of the way up the teeth of the overflow which puts it just over 1/2" from the top of the tank if the top of the overflow is flush with the top of the tank.
Any advice would be appreciated.
The tank is going to be rimless. Question is, where should the water level be in the tank? I was told the water level would be about 1/2-3/4 of the way up the teeth of the overflow which puts it just over 1/2" from the top of the tank if the top of the overflow is flush with the top of the tank.
Any advice would be appreciated.
