So a quiet week this week, not much completed at all on the tank as I am waiting for all of the plumbing, pipes, fittings etc which I had to order from 4 different suppliers. So everything is coming at different times and am still waiting on a lot to even be in stock. Seems 63mm stuff is not so common in Europe. However I did receive two US Solid electric ball valves and various fittings so i can start getting the ATO lines run. And also received and F7 floating Mighty Magnet. And since i was there i decided to buy spare algae cutter bags, dozer pad and there scratch removal set and polish kit for the outside. Also got some good and bad news, my A400 should be turning up this week but the tank is not going to ship until the 13th, as with all of the shenanigans going on in the world at the moment the volume of traffic to this region has reduced dramatically. So probably wont see the tanks until the end of September which is annoying but also lets me cruise along and get all the other things done that still need to be done. Boring post but it is what it is, and the gathering of all of the stuff is taking much longer than expected. have a great week







