Cor 20 plumbing size for manifold?

fishstix

Active Member
View Badges
Joined
Feb 5, 2017
Messages
367
Reaction score
58
Rating - 0%
0   0   0
I was going to build a manifold to run 2 reactors each 1/2 plumbing and then a UV which is 3/4. Should I build the manifold as 1" or should I build it as 1 1/4 which is the same out as my Cor 20? 1" would fit better for me, but I want to do what going to work best for the manifold and the items connected.

Thanks
 

Gablami

Valuable Member
View Badges
Joined
Apr 14, 2017
Messages
1,314
Reaction score
1,843
Rating - 0%
0   0   0
If you want to maximize flow, then you will want to keep it as large for as long as possible, and reduce right angles and use 45 degree elbows when possible.

But then again, if 1” works better for you, it’ll probably still work fine.

I would have it come out vertically from the pump at 1.25 and the make the initial turn(s), and then start reducing to 1. But that’s just me and how I’m designing my new manifold.
 

TOP 10 Trending Threads

WHAT AMOUNT OF LIVE ROCK AND SAND SHOULD BE PRIORITIZED FOR OPTIMAL BIODIVERSITY/FILTRATION?

  • 100% live rock + bagged sand

    Votes: 38 27.3%
  • 100% dry rock + 100% live sand

    Votes: 47 33.8%
  • 50/50 live/dry rock, 50/50 live/bagged sand

    Votes: 30 21.6%
  • 75% live rock, 25% live sand

    Votes: 14 10.1%
  • 25% live rock, 75% live sand

    Votes: 10 7.2%
Back
Top