IM Plumbing

DmitryB

Well-Known Member
View Badges
Joined
May 26, 2026
Messages
573
Reaction score
439
Location
Hunter, NY
Rating - 100%
1   0   0
Ok got my IM 170 INT today and it's heavy! Then I got to the plumbing. I'm not a DYI person in general, so even though it's all pre-made for you, it's still a puzzle. And IM's instructional video is not helpful in many ways because the actual hardware is actually more pre-assembled than in the video, so the woman demonstrating is doing all kinds of things I don't understand because we don't have to do them! In any case, somehow I think I managed. But one question: see screen grab below from the instructions about Gate Valve being required. It is not provided and it's not shown in the installation video. Anybody have any idea - especially those who have done IM installations - what this is and if it's actually needed? (Incidentally, they also say they do not provide plumbing below the bulkheads, but they did! It wasn't in the instructional video either, but there were extra pieces tied together. So these instructions are a bit wrong in any case.)

Screenshot 2026-07-21 at 12.01.30 AM.png
 
It’s used to dial in the flow to make it dead silent. Basically you control the water level in your overflow box with it. The more you open the valve the faster the water leaves the box creating water rushing noise. If you slowly close the valve you maintain a water level and decrease the turbulence of flow in your box making less rushing water noise
 
LOL ok so their instructions are just wrong.

NOW, having some issues with the plumbing. Both drain pipes are leaking - hopefully it's just the bulkheads need to be tightened - which I can't do when the tank is full because it's in what I intend to be its final place and can't reach the overflow!

 
Ok now what in the world is this noise?!



EDIT: Ok did a quick search and that gate valve (!!) needs to be closed to raise the level of water in the overflow. I did and that horrible noise stopped. Now the only noise is the dripping water from the drain pipes.

IM says to just hand-tighten the bulkheads and insert the PVC pipes without force. But... maybe it actually needs some kind of adhesive? Now I'll be paranoid all the time.
 
Last edited:
Ok did a quick search and that gate valve (!!) needs to be closed to raise the level of water in the overflow.
You close it partially, just enough to make the drains silent! You do not want to completely close it!

IM says to just hand-tighten the bulkheads and insert the PVC pipes without force. But... maybe it actually needs some kind of adhesive?
Oh wow! Yeah… you should be cementing pipe into fittings… you can technically form a seal without cement, but it isn’t going to be a robust seal, and nobody likes random leaky plumbing!

I’ve got not clue if IM uses PVC, or CPVC plastic for the pipe and fittings, so my recommendation here would be “all purpose” pipe cement!

— just make sure you’ve got all your plumbing where you like it, and note that pipes will easily slip into fittings all the way to the fitting’s shoulders after cement is applied (spin 1/4 turn while seating pipe)… you’ve only got a few minutes of work time before the cement begins to really solidify, so do your fittings one-by one, ideally holding the pipe into the corresponding fitting for 30-60 seconds after seating it so it doesn’t try to slowly push itself back out before the cement stops it! (Best-bet would be watching a simple how-to video on cementing plastic pipe if you’re a visual learner!)
 
Ok did a quick search and that gate valve (!!) needs to be closed to raise the level of water in the overflow.
You close it partially, just enough to make the drains silent! You do not want to completely close it!

IM says to just hand-tighten the bulkheads and insert the PVC pipes without force. But... maybe it actually needs some kind of adhesive?
Oh wow! Yeah… you should be cementing pipe into fittings… you can technically form a seal without cement, but it isn’t going to be a robust seal, and nobody likes random leaky plumbing!

I’ve got not clue if IM uses PVC, or CPVC plastic for the pipe and fittings, so my recommendation here would be “all purpose” pipe cement!

— just make sure you’ve got all your plumbing where you like it, and note that pipes will easily slip into fittings all the way to the fitting’s shoulders after cement is applied (spin 1/4 turn while seating pipe)… you’ve only got a few minutes of work time before the cement begins to really solidify, so do your fittings one-by one, ideally holding the pipe into the corresponding fitting for 30-60 seconds after seating it so it doesn’t try to slowly push itself back out before the cement stops it! (Best-bet would be watching a simple how-to video on cementing plastic pipe if you’re a visual learner!)
Yeah the leaks are gnarly! IM says no adhesive necessary (and their instruction video reflects that) but I'm not gonna listen to that. I should use it on both the bulkheads before screwing them and the pipes going into the bulkheads?

IM uses Sched 80 PVC.

Gonna empty the tank tomorrow, seal the connections. And then just pour water into the overflow to make sure it's not leaking. I don't think I can do another 170 + sump fill of fresh water!

Here's the double leak video

 

TOP 10 Trending Threads

ARE YOU READY TO CONFESS TO CRAZIEST, DUMBEST, FUNNIEST THING YOU’VE EVER DONE IN REEFING?

  • Yeah, I'll confess! (Share your story in the comments!)

    Votes: 33 56.9%
  • Nah, I'll keep mine a secret...(Don't be like that, share with the class!)

    Votes: 25 43.1%
Back
Top
Home
Post thread…
Market
What's new