- Joined
- Apr 29, 2020
- Messages
- 1,049
- Reaction score
- 538
So I’m setting up my plumbing for new tank. I plan to run two return pumps. One going straight to tank and one that will feed the manifold which will have a carbon/gfo dual reactor, a calcium reactor down the road, and one left empty for future use if needed. The return on the 100 IM ext is 3/4th so the manifold is 3/4th plumbing. I’m using two COR 15 apex return pumps. Did I set this manifold up right and does my plan sound okay? I attached arrows showing which way the flow arrows are on the ball valves.