- Joined
- Dec 22, 2016
- Messages
- 321
- Reaction score
- 195
So what correct fitting would go from the output of the L1 to the 1" schedule 80 pipe? ThanksStill some work to do, but I got the tank back up and running late last night after the sump/plumbing/pump/reactors swap. I still need to do my dosing lines from the DOS, organize the cables a tad better and add my lighting. I'll get some pictures with my good camera once I get a chance.
IMG_7676 by Toby Broadfield, on Flickr
IMG_7681 by Toby Broadfield, on Flickr
IMG_7696 by Toby Broadfield, on Flickr