My bulkheads are 1"slip. I run 1" pvc inside the bulkhead and put a union on it so I can unhook it.
I put in dual gate valves on the water lines going back to the tank so I can equal them out . I have $50 in gate valves on the tank. lol. Now its time to fill with water. Check for leaks ect. once I get it dialed in ill add the controller from my 65 and move the stock over.
I put in dual gate valves on the water lines going back to the tank so I can equal them out . I have $50 in gate valves on the tank. lol. Now its time to fill with water. Check for leaks ect. once I get it dialed in ill add the controller from my 65 and move the stock over.